ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿
³                           PERIODO 1983-1996                        ³
ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ

  LS // Dependent Variable is PBI
  Date: 05/08/96   Time: 21:54
  Sample: 1983:01 1996:02
  Included observations: 158
  Convergence achieved after 3 iterations

  Variable      Coefficient    Std. Error    T-Statistic     Prob.
  
  C              104.6882       1.351860       77.44016      0.0000
  MA(12)         0.575763       0.065762       8.755304      0.0000
  
  R-squared              0.308904    Mean dependent var      104.2861
  Adjusted R-squared     0.304474    S.D. dependent var      13.14299
  S.E. of regression     10.96102    Akaike info criterion   4.801268
  Sum squared resid      18742.45    Schwartz criterion      4.840035
  Log likelihood        -601.4924    F-statistic             69.72856
  Durbin-Watson stat     0.318825    Prob(F-statistic)       0.000000