ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿
³                           PERIODO 1985-1996                        ³
ÀÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÙ
  
  LS // Dependent Variable is PBI
  Date: 05/08/96   Time: 22:22
  Sample: 1985:01 1996:02
  Included observations: 134
  Convergence achieved after 3 iterations
  
  Variable       Coefficient    Std. Error    T-Statistic     Prob.
  
  C               105.8606       1.484085      71.33056      0.0000
  MA(12)          0.538308       0.074862      7.190715      0.0000
  
  R-squared             0.289417     Mean dependent var    105.4419
  Adjusted R-squared    0.284034     S.D. dependent var    13.46310
  S.E. of regression    11.39177     Akaike info criter    4.880596
  Sum squared resid     17129.97     Schwartz criterion    4.923847
  Log likelihood       -515.1377     F-statistic           53.76296
  Durbin-Watson stat    0.292125     Prob(F-statistic)     0.000000